Bridge Hydro-mining Thickness Measurements |
|||||
Status | Complete View Final Report: PDF |
||||
Sequential Number | R334 | ||||
Identification Number | 00042275 | ||||
Matching Research Agency |
Missouri Department of Transportation |
||||
Principal Investigator |
Norbert Maerz |
||||
Student Involvement |
Undergraduate students will be learning to operating the LIDAR equipment. Graduate students will be learning to program data manipulation algorithms |
||||
Project Objective |
To measure the thickness of concrete material removed by hydro mining and manual scaling (MODOT project) on 2 lanes each of 3 MODOT bridges up to 1000’ long, using before and after LIDAR (Light Detection and Ranging) scans and developing change detection algorithms. | ||||
Project Abstract |
We propose to measure the thickness of the removed concrete material as a result of hydrodemolition (and manual removal) using before and after LIDAR measurements and adapting/developing change detection algorithms. | ||||
Relationship to other Research/Projects |
GPR data is related to the MODOT/UMC/MST Bridge Project. |
||||
Transportation-Related Keywords |
Hydro mining, LIDAR, thickness | ||||
Technology Transfer Activities |
Method details and algorithms will be made available to MODOT |
||||
Project Deliverables |
Plan view maps of the elevation difference between pre and post hydrodemolition surfaces, precision is expected to be less than 1 cm. | ||||
Anticipated Benefits |
1) Develop a methodology and prove the concept for this kind of |
||||
Milestones |
|